Saturday, September 3, 2016

Progress at the Temple Site

A drone picture sent to us by the quantity surveyor.

left basin is the missionary housing area
right basin is the Temple area
and to the right of the photo, the flat areas,
are the parking areas.


I would love to show you more photos,
and I am not at liberty to do so.

I created a facebook page "Durban South Africa Temple Construction"
on which I can put photos from outside the boundaries.
Please go there periodically and see how things are going.

We have had a very busy couple of weeks settling in, 
sourcing things we need, and ironing out inconveniences.
The lift in the building is still not working
so we think lots before we leave the flat or come back!

No comments:

Post a Comment